Tag : NZ Transport Agency

Contractor Network Outcomes Contracts (NOCs) Roading

Road Asset Management (RAM) contracts

Charles Fairbairn
Road asset management is about managing existing roads as an integrated asset in the most cost-effective manner. RICHARD SILCOCK talks with some of those involved
Contractor Roads of National Significance

Giant crawler-crane helps construct long bridge

Charles Fairbairn
A giant crawler-crane was used for constructing the longest bridge on the Kapiti Expressway. RICHARD SILCOCK checks out the engineering challenges and some stats on
Contractor Profile

Farewelling Geoff Dangerfield

Charles Fairbairn
NZ Transport Agency CEO Geoff Dangerfield recently stepped down from his role as leader of the agency, after taking the organisation through a complex merger