The highest bridge to be constructed on the Hamilton section of the Waikato Expressway required 144,000 cubic metres of earth to be excavated beneath it. Richard Silcock talks with those involved in the project.
This 18.8 metre high curved bridge on the Hamilton section of the Waikato Expressway straddles an excavated cutting through...