The highest bridge to be constructed on the Hamilton section of the Waikato Expressway required 144,000 cubic metres of earth to be excavated beneath it....
A giant crawler-crane was used for constructing the longest bridge on the Kapiti Expressway. RICHARD SILCOCK checks out the engineering challenges and some stats on...
Construction of the $630 million, four-lane Kapiti Expressway is forging ahead and despite technical challenges and a very wet winter contractors are rejoicing over progress....